Occupational Accident Risk, Construction Safety, FMEA, Risk Assessment, Construction ProjectAbstract
The construction industry is one of the sectors with the highest occupational accident risk. This study was conducted at the Justice Tower Phase 1 Building Construction Project, Faculty of Law, Hasanuddin University, which involves working at height, heavy equipment operation, and activities within an active campus environment. The objectives are to identify potential occupational accident risks, determine dominant risks, and formulate control strategies. A quantitative approach supported by qualitative methods was adopted, with 39 respondents selected from a population of 60 workers using the Slovin formula. Analysis employed Failure Mode and Effect Analysis (FMEA) to calculate the Risk Priority Number (RPN), and IBPRP and AKK methods based on Ministerial Regulation PUPR No. 10 of 2021. Results identified 80 potential occupational accident risks across column work (22 risks), beam work (20 risks), floor slab work (20 risks), and concrete staircase work (18 risks). IBPRP assessment yielded 8 low risks (10%), 65 moderate risks (81.25%), and 7 high risks (8.75%). FMEA analysis identified 56 dominant risks, with the highest RPN value of 366,036 at variable X.3.2.2 (operator failing to observe workers near mobile crane). Control strategies encompass elimination, substitution, engineering controls, administrative controls, and PPE in accordance with the risk control hierarchy.
Downloads
References
Alvand, A., Mirhosseini, S. M., Ehsanifar, M., Zeighami, E., & Mohammadi, A. (2023). Identification and assessment of risk in construction projects using the integrated FMEA-SWARA-WASPAS model under fuzzy environment: A case study of a construction project in Iran. International Journal of Construction Management, 23(3), 392–404. https://doi.org/10.1080/15623599.2021.1877875
Dewi, E. K. (2023). Analisis risiko kecelakaan kerja pekerjaan pier dan pierhead terhadap keselamatan pekerja (Studi kasus pembangunan jalan tol Solo–Yogyakarta seksi 1) [Skripsi]. Universitas Tidar.
Dewi, N. S. (2025). Penerapan IBPRP sebagai upaya pencegahan kecelakaan kerja pada pekerjaan shear wall [Skripsi]. Universitas Islam Indonesia.
Ghuzdewan, T. A. (2025). Manajemen proyek konstruksi berbasis produktivitas dan prinsip Pareto. In Simposium Nasional Teknologi Infrastruktur (SNTI). Universitas Gadjah Mada.
Gita, M. A. (2015). Analisa risiko kecelakaan kerja proyek Marvell City Linden Tower Surabaya dengan metode FMEA dan FTA [Master's thesis]. Institut Teknologi Sepuluh Nopember.
Ihsan, A. F. (2022). Analisis risiko kecelakaan kerja menggunakan metode FMEA pada proyek pembangunan jalan tol ruas Sigli–Banda Aceh struktur elevated [Master's thesis]. Institut Teknologi Sepuluh Nopember.
Ilham, R., & Basuki, M. (2023). Penilaian risiko K3 pekerjaan reparasi kapal menggunakan metode HIRADC. Ocean Engineering: Jurnal Ilmu Teknik dan Teknologi Maritim, 2(2), 45–56. https://doi.org/10.58192/ocean.v2i2.1132
Iman, M. (2018). Analisis risiko kecelakaan kerja pada proyek jembatan Sembayat Baru II Kabupaten Gresik dengan menggunakan metode FMEA [Master's thesis]. Institut Teknologi Sepuluh Nopember.
Jaya, N. M., Dharmayanti, G. A. P. C., & Ulupie Mesi, D. A. R. (2021). Manajemen risiko K3 (keselamatan dan kesehatan kerja) pada proyek pembangunan Rumah Sakit Bali Mandara. Jurnal Spektran, 9(1), 29–37. https://doi.org/10.24843/spektran.2021.v09.i01.p04
Melanson, A., & Nadeau, S. (2019). Resilience engineering for sustainable prevention in the manufacturing sector. American Journal of Industrial and Business Management, 9(1), 267–281. 10.4236/ajibm.2019.91017
Mufiq, M., & Huda, M. (2020). Risk assessment kecelakaan kerja pekerjaan struktur bangunan mall dan apartemen menggunakan metode FMEA. Jurnal Penelitian, 8(1), 45–56. https://doi.org/10.30742/axial.v8i1.1026
Peraturan Menteri PUPR Nomor 10 Tahun 2021 tentang Pedoman Sistem Manajemen Keselamatan Konstruksi. (2021). Kementerian Pekerjaan Umum dan Perumahan Rakyat.
Popov, G., Lyon, B. K., & Hollcroft, B. (2016). Risk assessment: A practical guide to assessing operational risks. John Wiley & Sons.
Rajab, M., et al. (2024). Penerapan metode FMEA untuk menganalisis risiko kecelakaan kerja pada pembangunan MTsN 6 Maluku Tengah. Jurnal Ilmiah Multidisiplin, 3(10). https://doi.org/10.56799/jim.v3i10.5251
Sugiyono. (2010). Metode penelitian pendidikan pendekatan kuantitatif, kualitatif, dan R&D. Alfabeta.
Zaupa, J. C. T., Catai, R. E., Corrêa, J. N., & Zaupa, J. C. (2023). Prioritization of preventive measures by using the FMEA tool in risk analysis in civil construction. Brazilian Journal of Production Engineering, 9(2), 14–26. https://doi.org/10.47456/bjpe.v9i2.40211
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Istiawati Darwis, Muhammad Dwiyanto Agung Prakasa, Muh. Sucitra Amanasah, Ulfah Ulfah (Author)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
©The author(s). Published by BEJTS
This is an open-access article distributed under the terms and conditions of the Creative Commons Attribution-ShareAlike 4.0 International License (CC BY-SA 4.0)