Studi Pengelolaan Risiko dan Keselamatan Kerja pada Proyek Pembangunan Base Transceiver Station

Authors

  • Dr. Widyo Nugroho Department of Civil Engineering, Faculty of Science and Engineering, Universitas Bojonegoro, Bojonegoro 62119 Author
  • Dr. Sulfiah Dwi Astarini Department of Civil Engineering, Faculty of Science and Engineering, Universitas Bojonegoro, Bojonegoro 62119 Author
  • Dr. Eko Prihartanto Department of Civil Engineering, Faculty of Engineering, Universitas Borneo Tarakan, Tarakan 77123 Author

DOI:

https://doi.org/10.35334/be.v9i3.251

Keywords:

risk assessment, base transceiver stations, analytical hierarchy process

Abstract

The construction of Base Transceiver Stations plays a crucial role in expanding digital connectivity and supporting economic transformation; however, its implementation involves various risks ranging from technical and financial aspects to occupational safety. This study aims to identify, classify, and prioritize risks in Base Transceiver Station construction projects using the Analytical Hierarchy Process method, based on data obtained from literature reviews, interviews, and questionnaires. The analysis results indicate that physical risks carry the most significant weight, followed by design, economic, and natural disaster risks, with overall risk assessments ranging from moderate to high levels. The occupational safety analysis further reveals that the highest risks occur in foundation works, tower structure erection, fabrication, and electrical installation, where human resources and work methods are the dominant contributors to potential accidents. Therefore, the success of Base Transceiver Station construction projects is highly determined by the effectiveness of managing physical risks and the consistent implementation of occupational safety standards, ensuring that project objectives in terms of time, cost, and quality can be achieved while safeguarding worker safety

Downloads

Download data is not yet available.

References

Aladayleh, K. J., & Aladaileh, M. J. (2024). Applying Analytical Hierarchy Process (AHP) to BIM-Based Risk Management for Optimal Performance in Construction Projects. In Buildings (Vol. 14, Issue 11). https://doi.org/10.3390/buildings14113632

Ali, M. B., Altamimi, A., Kazmi, S. A., Khan, Z. A., & Alyami, S. (2024). Sustainable Growth in the Telecom Industry through Hybrid Renewable Energy Integration: A Technical, Energy, Economic and Environmental (3E) Analysis. In Sustainability (Vol. 16, Issue 14). https://doi.org/10.3390/su16146180

Altamimi, A., Ali, M. B., Kazmi, S. A., & Khan, Z. A. (2024). Multi-Agent Reinforcement Learning Optimization Framework for On-Grid Electric Vehicle Charging from Base Transceiver Stations Using Renewable Energy and Storage Systems. In Energies (Vol. 17, Issue 14). https://doi.org/10.3390/en17143592

Amalin, R. E., & Handayeni, K. D. M. E. (2017). Kriteria Lokasi Pembangunan Tower BTS (Base Transceiver System) di Kota Kediri. Jurnal Teknik ITS. https://doi.org/10.12962/j23373539.v6i1.22198

Burcar Dunovic, I., Radujkovic, M., & Vukomanovic, M. (2016). Internal and external risk based assesment and evaluation for the large infrastructure projects. Journal of Civil Engineering and Management. https://doi.org/10.3846/13923730.2015.1128479

Chou, J.-S., Liao, P.-C., & Yeh, C.-D. (2021). Risk Analysis and Management of Construction and Operations in Offshore Wind Power Project. In Sustainability (Vol. 13, Issue 13). https://doi.org/10.3390/su13137473

Huang, H., Zhang, Q., Xu, H., Li, Z., Tian, X., Fang, S., Zheng, J., Zhang, E., & Yang, D. (2024). Risk Identification and Safety Evaluation of Offshore Wind Power Submarine Cable Construction. In Journal of Marine Science and Engineering (Vol. 12, Issue 10). https://doi.org/10.3390/jmse12101718

Li, R. Y., Chau, K. W., & Zeng, F. F. (2019). Ranking of Risks for Existing and New Building Works. In Sustainability (Vol. 11, Issue 10). https://doi.org/10.3390/su11102863

Mustafa, M. A., & Al-Bahar, J. F. (1991). Project Risk Assessment Using the Analytic Hierarchy Process. IEEE Transactions on Engineering Management. https://doi.org/10.1109/17.65759

Nugroho, W. (2020). Study on determining priority of Base Transceiver Station (BTS) construction. In Advances in Business, Management and Entrepreneurship (1st ed., pp. 167–171). CRC Press, Taylor and Francis Group. https://doi.org/10.1201/9781003131465-35

Osei-Kyei, R., Narbaev, T., & Ampratwum, G. (2022). A Scientometric Analysis of Studies on Risk Management in Construction Projects. In Buildings (Vol. 12, Issue 9). https://doi.org/10.3390/buildings12091342

Refsdal, A., Solhaug, B., & Stølen, K. (2015). Risk identification. In SpringerBriefs in Computer Science. https://doi.org/10.1007/978-3-319-23570-7_7

Sheikallavudeen, S., & Sankar, S. . (2015). Hazard Identification, Risk Assessment and Risk Control. SSRG International Journal of Industrial Engineering (SSRG - IJ IE ).

Tereso, A., Santos, C., & Faria, J. (2025). Risk Management Practices in the Purchasing System of an Automotive Company. In Systems (Vol. 13, Issue 6). https://doi.org/10.3390/systems13060444

Widyatmoko, & Mauludiyanto, A. (2015). Perencanaan Jumlah dan Lokasi Menara Base Transceiver Station (BTS) Baru pada Telekomunikasi Seluler di Kabupaten Lumajang Menggunakan Metode Analytical Hierarchy Process-TOPSIS (AHP-TOPSIS). Jurnal Teknik ITS.

Zhang, Q., Huang, H., Xu, H., Li, Z., Tian, X., Fang, S., Wang, J., Xie, C., & Yang, D. (2024). A Hierarchical Analysis Method for Evaluating the Risk Factors of Pile Foundation Construction for Offshore Wind Power. In Sustainability (Vol. 16, Issue 18). https://doi.org/10.3390/su16187906

Downloads

Published

22-12-2025

Issue

Section

Articles

How to Cite

Studi Pengelolaan Risiko dan Keselamatan Kerja pada Proyek Pembangunan Base Transceiver Station. (2025). Borneo Engineering: Jurnal Teknik Sipil, 9(3), 247-261. https://doi.org/10.35334/be.v9i3.251