“Application of the Five-Minute Rating Method in Measuring Labor Productivity at a Jakarta Office Tower Project”. Borneo Engineering: Jurnal Teknik Sipil, vol. 10, no. 1, Apr. 2026, pp. 20-28, https://doi.org/10.35334/be.v10i1.524.