“Application of the Five-Minute Rating Method in Measuring Labor Productivity at a Jakarta Office Tower Project” (2026) Borneo Engineering: Jurnal Teknik Sipil, 10(1), pp. 20–28. doi:10.35334/be.v10i1.524.