Application of the Five-Minute Rating Method in Measuring Labor Productivity at a Jakarta Office Tower Project. (2026). Borneo Engineering: Jurnal Teknik Sipil, 10(1), 20-28. https://doi.org/10.35334/be.v10i1.524